Use seventh floor between Crabtree and Parran starting 7/24


The general contractor would like to flip access to Crabtree to the seventh floor for a two-week duration starting on July 24. This is necessary to perform floor fill activities in preparation for the floors to receive carpet and vinyl tile. Following the fill operation they would like to (flip back) and resume the same access on the 6th floor until a final plan is developed for the first floor access to Crabtree and the Auditorium.